My husband is about one day's work away from being finished remodeling our downstairs bathroom. It was a rather worn-out room, last remodeled in the 80s, and he gutted it to the rafters, ran new pipes and electric, put in the drywall and the floor and wall tile, and even found an antique bathtub on Craig's list. The only thing he didn't do himself was refinish the inside of the tub. You can see what it looks like in the pictures below, and you can see the part that needs to be done is that the shower & shower curtain pipes have to be installed. The thing the towels are hanging on is actually a towel warmer...this room never had any heat source, so he installed a warmer that he could tap into the radiator system, so now it's heated and looks pretty and I'm so so so happy.